Solar wheeling: solar power credited to your meter, without panels on your roof

Wheeling brings solar power to your site over the existing Eskom or municipal grid, at an estimated R1.20 per kWh. See how the numbers could work for you, and whether wheeling, rooftop solar, or both is the right fit.

Start my energy assessment Try the wheeling estimator

Scattered sites, one shifting power bill

Does this sound familiar?

  • One of your sites has room for solar. The other five don't.
  • Eskom's tariffs have risen by an average of about 11% a year over the last ten years.
  • Your busiest site can trigger steep demand charges, even while another site of yours has room to spare.
  • Every extra site adds its own bill, its own meter, and its own set of decisions to make about power.

We believe a business should be able to lower the bill at every site, not only the one with a big roof.

We help businesses with several sites weigh wheeling against rooftop solar, or use both.

Wheeling lets you use one site's sun, or land, to lower the bill at your other sites, without fitting panels everywhere. It is a money and metering arrangement, not a new set of wires running to your site. A solar plant feeds power into the grid at its own end. You keep drawing power from the grid at your end, exactly as you do today. What changes is the paperwork behind your meter: the units that plant fed in are matched against the units you use each month and credited to your account. You pay the plant's agreed rate for those units, plus your utility's wheeling fee.

Think of it less like a pipe carrying water from a farm to your factory, and more like a transfer between two accounts: the value of the energy moves on paper between the generator and you, while the actual electricity you draw still comes from the nearest point on the grid, the same way it always has.

Diagram: electrons mix on the grid, while the money flows to your bill through the wheeling arrangement

For a business with several sites, this matters because the sun, the land and the grid connection that suit a solar plant best are often nowhere near the site that actually uses the most power. Wheeling separates those two questions: where the power is generated, and where the bill needs lowering.

We start every wheeling conversation with a free energy assessment of your bill and your sites, then help you weigh wheeling against an on-site FoxESS or Sigenergy system, or both together. We handle the CoC and SSEG application for any on-site system.

And we can do the same for you.

What the numbers can look like, as an estimate

These are worked figures to show how wheeling works, not a quote. Your own figure comes from a free energy assessment.

Cut the energy price. Take a solar plant that generates about 5 GWh a year. At an estimated wheeling tariff of R1.20 per kWh, against an example blended grid price of about R2.10 per kWh, that spread comes to about R4.5 million a year in gross savings on the energy itself.

Keep most of the saving. After the wheeling fee your utility charges for using its wires, the net saving on that same 5 GWh a year comes to about R3.8 million, which means most of the gross saving stays with you.

Treat it as an estimate. These figures show the shape of a wheeling deal on a large, steady user's bill, which means your real rate, your real fee, and your real saving depend on your own site, your generator, and your utility's own charges.

Wheeling vs rooftop solar vs both

Neither one replaces the other. Our own edge is doing both: rooftop FoxESS or Sigenergy on the sites that can carry it, wheeling for the rest.

Rooftop solarWheelingBoth, our approach
Roof or land space neededYes, on your own roof or a ground mountNone. The plant sits wherever the sun, land and grid connection make sensePanels where you have the space, wheeling for everywhere else
Who it suitsAny site with roof or land space and a bill worth coveringA large, steady user, usually on a medium voltage or higher connection, especially a site with no roof to spareA business with more than one site, or more demand than one roof can carry
What you pay forYour own system, once, plus any financeAn estimated solar tariff per kWh, plus your utility's own wheeling feeYour own on-site system, plus wheeling only for what the roof can't cover

See Solar Power Inverters and Solar Power Backup for the on-site side of that choice.

Who can wheel today

Wheeling rules are set by Eskom or by each city, not by ZenSolar. Here is what the official pages say, for the connections we checked.

EskomJohannesburg (City Power)Cape TownDurban (eThekwini)
StatusLive, including a virtual wheeling routeLive: City Power has its own wheeling arrangement for outside generators supplying a customer on its networkLive since March 2025, alongside an ongoing wheeling pilotLive: wheeling tariffs published for the 2026/27 year
Who qualifiesConnected at medium voltage or higher, on a time of use tariffOn City Power's own network, with a use-of-system agreement in place between the generator and the cityConnected at medium or high voltage, on a time of use tariffOn the Industrial Time of Use tariff, across a wide range of connection levels

This is a fast-moving area: some cities have a live framework today, others are still working on theirs, so the city where your site sits matters as much as the size of your bill.

In Pretoria, the City of Tshwane's own published policy does not yet let small generators wheel power.

Your own rooftop solar is worth doing everywhere we work, wheeling or not.

Registering the generator

If a solar plant connects to the grid, it has to be registered. A smaller connected generator registers with whichever utility supplies its own site, Eskom or the local municipality. A bigger one registers with the national energy regulator, NERSA, instead of holding a full generation licence. This registration belongs to the generator behind a wheeling deal, not to you as the buyer of the wheeled power.

On-site battery plus wheeling

Use cheaper power when it costs most. A battery on your own site can store cheaper power, whether that's wheeled solar, off-peak grid power, or your own rooftop solar, and give it back to you at the priciest hours of the day.

Same idea, bigger mix. The same principle that makes a battery useful on a rooftop-only system still applies once wheeling is part of the mix.

Your own mix. Your own combination of wheeling, rooftop solar and battery storage depends on your sites, your tariff and your demand pattern, which means it is exactly what a free energy assessment works out, not a fixed formula we apply to every business the same way.

What ZenSolar does

We start with a free energy assessment of your bill and your sites. We can design and install an on-site FoxESS or Sigenergy system for the sites that have the space, financed and installed the same way as any of our commercial work: see Services for the finance and installation detail. And we help you look at your supply options, including whether wheeling fits your city's rules and your tariff.

Diagram of who does what in wheeling: the private supplier generates and trades the power, Eskom or the city maintains the wires, meters the usage and applies the wheeling credit to your bill, and ZenSolar does the energy assessment, fits on-site solar, models the wheeling return and helps you set up wheeling

Not sure how the numbers stack up for your own bill?

Try the wheeling estimator

No new roof or land needed

The solar plant sits wherever the sun, land and grid connection make sense, and the power is credited against your own bill, which means you can lower the bill without fitting panels at that site.

One line to plan around

An estimated solar tariff plus a wheeling fee, instead of a shifting Eskom or municipal bill you can't predict, which means a number your finance team can plan around.

Combine it with your own rooftop system

Put solar panels with a FoxESS or Sigenergy inverter and battery where you have space, and use wheeling to cover the rest, one coordinated plan across all your sites, which means each site gets the answer that fits it.

A free assessment before you commit

We look at your real numbers first, so you know your own figures before you sign anything, which means you decide on facts, not a sales pitch.

Backed by our own 10-year swap-out warranty

Any on-site inverter and battery we install for you is covered by ZenSolar's own 10-year swap-out warranty, which means a failed part is swapped out.

Our team and preferred, vetted installers

Every on-site system we build meets SANS standards, with the CoC and SSEG application handled for you, which means no compliance headaches.

What actually happens in a wheeling deal

These are the steps the official paperwork actually follows, in the order they usually happen.

1

We start with a free energy assessment

We look at your bill, your sites, and whether wheeling, rooftop solar, or both make sense for you.

2

The generator's own paperwork

A generator applies to Eskom or the municipality, gets a cost estimate letter, then signs a connection and use-of-system agreement.

3

Your own supply agreement is amended

You, or your municipality where you sit inside a metro's network, sign an amendment to your existing electricity supply agreement, or use Eskom's own virtual wheeling route where it fits.

4

Power and credits start flowing

Once the paperwork and metering are in place, the generator's output is matched against your usage each month, and you're billed for the wheeled tariff plus the utility's own fee.

Finance available through South Africa’s leading banks

Merchant West logo featuring a circular icon with 'MW' and text 'MERCHANT WEST' with an underline. FNB logo featuring a black silhouette of a tree against an orange sun and teal horizon, next to 'FNB' in teal text. Absa logo with the word 'absa' in lowercase red text enclosed within a red dashed oval. Standard Bank logo, a blue and silver shield with a stylized flag or 'S' inside.

Why look at wheeling with ZenSolar first?

With us

  • A free energy assessment of your real numbers, before anything is signed
  • Wheeling weighed honestly against rooftop solar, or both together
  • Your own city's rules checked before you commit
  • An on-site system, if you want one, backed by our 10-year swap-out warranty

With them

  • A sales pitch before your own numbers are checked
  • Rooftop solar never mentioned as an option
  • Your city's own rules not checked first
  • No clear warranty behind any on-site kit
  • A single path pushed, whether or not it fits your site

Watch: energy wheeling explained

Download the guide (PDF)

Frequently asked questions

Not ready for a full assessment? Try the wheeling estimator first, or talk to us about your options.

Find out what wheeling could mean for your own bill

Start my energy assessment

Request a solar quote for your business

Tell us about your business and your electricity use. We will size a system and finance option, then confirm a real quote after a short site check.